Town of Camden Building Permit Fee Schedule
Amended by Resolution of the Town Board on September 8, 2025
Section A: Standard Permit Fees
Permit Type
|
Fee
|
Basic Building Permit
Decks, Porches, Garages, Pole Barns, Woodstoves, Fireplaces, Storage Sheds (145-600 sq ft)
|
$50.00
$.15 per sq ft -Attached/Detached garages, pole barns or storage sheds 601 sq ft or more
|
Additions & Alterations
|
$80.00 (Habitable) plus $.15 sq ft over 600 sq ft / $60.00 (Non-Habitable) plus $.10 sq ft over 600 sq ft
|
New Residential Dwelling / Modular
New Multi-Family (3 or more units)
|
$150.00 plus $.10 sq ft over 1500 sq ft plus Garage fee $150 per unit
|
Single Family Conversion
|
$150.00 per unit plus $.10 sq ft over 1500 sq ft (Change of Occupancy Applies)
|
Manufactured Home
|
$100.00 (Single) / $150 (Double) plus $.10 sq ft over 1500 sq ft
|
New Commercial Construction
|
Minimum $300.00 or $.20 sq ft.
|
Commercial Additions
|
$0.20 per sq ft (Minimum $200.00)
|
Commercial Accessory Structures
|
$0.20 per sq ft (Minimum $150.00)
|
Commercial Conversions/Alterations
|
$0.20 per sq ft (Minimum $200.00)
|
Permit Renewals
|
Same cost as original permit (expires within 1-year)
|
Septic Systems (with engineered stamped drawings)
|
$50.00
|
Private Residential Solar System (design required)
|
$75.00
|
Swimming Pools
|
$60.00 (Above Ground), w/deck up to 150 sq $100.00 (In-ground), provide NYS Regulations
|
Demolition Permit
|
$25.00 (Asbestos Evaluation Required and Abatement Report required)
|
Sign Permit (Municipal Law requirements available in Codes Office)
|
$25.00
|
Communication Towers (drawings & engineered calculations required)
|
$3.00 per vertical foot (new or upgrading current)
|
Section B: Penalty for Construction Without a Permit
Pursuant to Town Board Resolution, any person, contractor, or entity found to be constructing, altering, placing, or installing any structure or system listed above without first obtaining a valid building permit shall be subject to the following penalty:
- Penalty Fee: Double the standard permit fee applicable to the project type and square footage.
- Retroactive Application: This penalty shall apply retroactively to the date construction commenced.
- Additional Enforcement: Penalties shall be assessed in addition to any other enforcement actions authorized under Town Law or the New York State Uniform Building and Fire Prevention Code.
Section C: Enforcement Authority
The Code Enforcement Officer is authorized to investigate suspected violations and assess penalties in accordance with this resolution. Appeals may be submitted in writing to the Town Board within thirty (30) days of penalty issuance.
Section D: Effective Date
This amended fee schedule, and resolution shall take effect immediately upon adoption and shall apply to all construction activities initiated on or after that date.